Setting Air Handler Sections at UConn's Gant Building in Storrs
project·

Setting Air Handler Sections at UConn's Gant Building in Storrs

Quick Pick Crane ran a 400-ton Terex AC350 at the UConn Gant complex in Storrs, lifting 22,000-pound air handler sections into place for P&D Mechanical.

Setting the LOVE Sculpture at Sacred Heart University
project·

Setting the LOVE Sculpture at Sacred Heart University

Quick Pick Crane set a multi-piece concrete LOVE sculpture at Sacred Heart University in Fairfield, Connecticut, using a 45 ton National crane on a rainy fall day.

Setting a 183-Foot Mast in Bridgeport with a Two-Crane Lift
project·

Setting a 183-Foot Mast in Bridgeport with a Two-Crane Lift

Quick Pick Crane set a 183-foot, 39,000-pound mast on a sailing yacht at Bridgeport Boat Works, using a 400-ton Liebherr and a 175-ton Grove in a tandem lift.

Hoisting Ductwork at 101 College Street in New Haven
project·

Hoisting Ductwork at 101 College Street in New Haven

Quick Pick Crane set up a 300-ton Grove all-terrain crane on MLK Boulevard to hoist ductwork to the upper floors at 101 College Street in New Haven, Connecticut.

130-Ton Grove RT Crane Delivered to a Steel Job at a Norwich, CT School
project·

130-Ton Grove RT Crane Delivered to a Steel Job at a Norwich, CT School

Quick Pick Crane hauled a Grove RT9130E-2 130-ton rough terrain crane to a steel job at a school in Norwich, Connecticut. Here is what it takes to get a big RT crane to a New London County job site safely.

Setting a Rooftop Unit at Rowayton Elementary in Norwalk
project·

Setting a Rooftop Unit at Rowayton Elementary in Norwalk

Quick Pick Crane brought a 400-ton Terex AC350 all-terrain crane to Rowayton Elementary School in Norwalk, Connecticut to set a rooftop HVAC unit over the building.

Trane Rooftop Units at the New Porsche Dealer, Fairfield, CT
project·

Trane Rooftop Units at the New Porsche Dealer, Fairfield, CT

Hoisting multiple Trane rooftop units at the new Porsche dealership in Fairfield, CT with our Liebherr LTM 1090.

Dunnage Steel for a Custom Air Handler, 101 College St, New Haven
project·

Dunnage Steel for a Custom Air Handler, 101 College St, New Haven

Setting dunnage steel for a custom air handler at 101 College Street.

Hanging Iron at the Yale SRC, New Haven, CT
project·

Hanging Iron at the Yale SRC, New Haven, CT

Setting structural steel for the Yale SRC addition with a 300-ton Grove 5250L.

Steel and Quantum-Research Dome atop Yale Kline Tower, New Haven, CT
project·

Steel and Quantum-Research Dome atop Yale Kline Tower, New Haven, CT

Hoisting steel and a quantum-research dome to the top of Yale's Kline Tower.

Clean Steam Boiler Plant Installation – 101 College St, New Haven
project·

Clean Steam Boiler Plant Installation – 101 College St, New Haven

Clean steam boiler plant installation completed at 101 College Street, New Haven — 241 feet in the air using a 20-ton rigging platform and powered dollies.

Two 2-MEG CAT Generators at St. Francis Hospital, Hartford, CT
project·

Two 2-MEG CAT Generators at St. Francis Hospital, Hartford, CT

Hoisting and assembling two CAT generators at St. Francis Hospital, Hartford.

Stay Connected

Follow us on social media for real-time updates from our projects and team.

Follow Us on Facebook

We would be pleased to offer you a quote on your next job.